intermediateStaging sample contentSeeded from the FGN.GG catalog on 2026-10-11 — reference copy, not synced
FS25 CDL: Load Securement — Log Transport

Load a log truck with a forestry crane, build a stable stack in the bunks, and deliver to the sawmill without shifting your load — low, balanced center of gravity and smooth control through curves, grades and tight yards.
Tasks
- 01Crane Load Plan — Build a Low Centered Stack
- 02Pre-Move Stability Check — Re-Seat Before Departure
- 03Controlled Transport — Grades and Curves with Unstable Load Mindset
- 04Sawmill Yard Maneuvering — Tight Turns Without Destabilizing Stack
- 05Unload Sequence Discipline — Top-Down Removal and Stack Control
Real-world alignment
Reflects load-securement thinking used in timber haulage: stacking for stability, pre-trip checks and controlled unloading.
- Points
- TBD
- Rewards
- TBD
- Certification
- TBD
- FGN.GG reference id
- 6e9337cd-3a7b-463c-9eb1-d55c2c982fa6